Projektovanje i izvodjenje glavne konstrukcije krova na objektu Ledena dvorana Maribor /

The ice surface of the Skating Hall in Maribor is covered with the roof structure consisting of two main externally prestressed concrete beams from which a secondary steel structure is suspended, and the perimeter columns supporting the roof structure ; the dimensions of the covered area are 67,60*6...

Popoln opis

Shranjeno v:
Bibliografske podrobnosti
Main Authors: Ačanski, Vukašin. (Author), Markelj, Viktor. (Author)
Format: Book Chapter
Teme:
Sorodne knjige/članki:Vsebovano v: Prednaprezanje '87
Oznake: Označite
Brez oznak, prvi označite!
LEADER 02063naa a2200193 ib4500
001 8803094
003 SI-MaCOB
005 20101213000000.0
008 040614s1987 rb |||||||||||||| ||srp c
040 |a KTFMB  |b slv  |c SI-MaIIZ  |e ppiak 
080 |a 624.07 
100 1 |a Ačanski, Vukašin.   |4 aut 
245 0 0 |a Projektovanje i izvodjenje glavne konstrukcije krova na objektu Ledena dvorana Maribor /   |c Vukašin Ačanski, Viktor Markelj.  
246 3 |a Design and construction of the main roof bearing structure for the object skating hall in Maribor 
300 |a Str. 79-93.  
520 |a The ice surface of the Skating Hall in Maribor is covered with the roof structure consisting of two main externally prestressed concrete beams from which a secondary steel structure is suspended, and the perimeter columns supporting the roof structure ; the dimensions of the covered area are 67,60*67,10 m. The main bearing structure of the roof consists of two externally prestressed beams, axially spaced for 12,20 m. At both ends the beams are supported by a steel cross girder set on the top of the double - sided column. The main beam consists of a concrete box beam (1, 60 m high, the width of the top flange is 2,40 m and of the bottom flange 0,90 m) reinforced concrete spacing elements (at the axial distance od 9,00 m and of different lenght), and of 6 tendons LH 12 Ø 15,2 mm, set in the steel shoes at the bottom side of the spacing elements. The tendons are pulled into galvanized steel ducts Ø 2,5" and they are prestressed according to the system P.H. - Gradis and anchored at the front of the concrete box beam. The anticorrosive protection of tendons has been effected by injecting the lithium grease Lipleks S-2 EP after the second - phase prestressing. 
653 0 |a gradbeništvo  |a gradbene konstrukcije  |a betonske konstrukcije  |a strešne konstrukcije 
700 1 2 |a Markelj, Viktor.   |4 aut 
773 0 |a Jugoslovensko društvo za prednaprezanje. Savetovanje (4 : 1987 : Beograd)  |t Prednaprezanje '87  |d Beograd : Jugoslovensko društvo za prednaprezanje, 1987  |w 2304002  |g Str. 79-93